References

We are proud to have completed a large number of projects successfully in partnership with our customers. 

A selection of our worldwide references is listed here.

2016 Nov. PR Tech GmbH. Saalbach Hintergremm WWTP. Analysis of mixing in anoxic tank. Duration: 1 month.

2016 Dec. Commune ARA Thunersee; ARA Thunersee WWTP. Analysis of dosing location for activated carbon powder in a mixed tank. Duration: 1 month.

2016 Dec. Consorcio de Aguas Bilbao Vizkaia. EDAR Galindo; Analysis and optimization of aeration tanks. Duration: 4 months.

2017 Jan. Veolia Water Technologies. Analysis of Feeding and distribution system in anaerobic bioreactor. Duration: 2 months.

2017 Jan. INVENT-ET. Browns WTP & Williams WTP (Durham). Analysis of mixing time in different basins; Duration: 2 months.

2017 Mar. Stereau S.A.S. Achère WWTP, Analysis of homogenization in basin. Duration: 3 Weeks.

2017 Apr. Stereau S.A.S. Achère WWTP, Analysis of homogenization in 2 basin. Duration: 3 Weeks.

2017 Apr. INVENT-ET. Fritz Island WWTP. Analysis of operation in biological reactors. Duration: 1 month.

2017 Apr. Geppert GmbH; Analysis of mixing performance of novel hexagonal mixer prototype; Duration: 2 weeks.

2017 May. INVENT Pacific. Kawana WWTP. Analysis of mixing in a MBBR; Duration: 1 month.

2017 May. Stereau S.A.S. Achère WWTP, Analysis of homogenization tank. Duration: 3 Weeks.

2017 May. INVENT-ET. Humber WWTP. Analysis of mixing tank. Duration: 1 month.

2017 Jun. INVENT Pacific. Melbourne Water WTP. Analysis of mixing, homogenization and TSS profile in non-regular tanks. Duration: 1 month.

2017 Jul. EJS Environmental Engineering. Netanya WWTP. Analysis and optimization of secondary clarifier. Duration: 4 months.

2017 Aug. Commune of Limoges. Limoges WWTP (France); Analysis and optimization of oxidation ditch at different operating conditions. Evaluation of proposed design compared with existing design. Duration: 3 months.

2017 Sep. INVENT-ET. Nashville WWTP. Analysis of mixing tank. Duration: 1 month.

2017 Sep. INVENT Pacific; Melbourne Water WTP. Analysis of operation in anoxic zone. Duration: 1.5 months.

2017 Dec. Hof Hacarmel Water Treatment Co. LTD; Nir-Etzion WWTP; Analysis and optimization of secondary clarifier and splitter chambers. Duration: 4 months.

2018 Jan. PWT Wasser- und Abwassertechnik GmbH. Analysis of slow decarbonisation reactor. Duration: 2 months.

2018 May. Tecalmit Flow Oy. Jyväskylä WTP. Analysis of flocculation basin with different mixer types. Duration: 2 months.

2018 May. Tecnología Intercontinental SAPI (Mexico). San Fernando WWTP; Analysis and flow optimization in 4 basins. Duration: 3 months.

2018 Jun. Sources S.A. Design of large double-ring aeration system to ensure even air flow distribution at minimal head loss. Duration: 1 month.