Referenzen

Wir sind stolz darauf, in partnerschaftlicher Zusammenarbeit mit unseren Kunden eine Vielzahl von Projekten erfolgreich abgeschlossen zu haben.

Eine Auswahl unserer weltweiten Referenzen finden Sie hier.

2016 Nov. PR Tech GmbH. Saalbach Hintergremm WWTP. Analysis of mixing in anoxic tank. Duration: 1 month.

2016 Dec. Commune ARA Thunersee; ARA Thunersee WWTP. Analysis of dosing location for activated carbon powder in a mixed tank. Duration: 1 month.

2016 Dec. Consorcio de Aguas Bilbao Vizkaia. EDAR Galindo; Analysis and optimization of aeration tanks. Duration: 4 months.

2017 Jan. Veolia Water Technologies. Analysis of Feeding and distribution system in anaerobic bioreactor. Duration: 2 months.

2017 Jan. INVENT-ET. Browns WTP & Williams WTP (Durham). Analysis of mixing time in different basins; Duration: 2 months.

2017 Mar. Stereau S.A.S. Achère WWTP, Analysis of homogenization in basin. Duration: 3 Weeks.

2017 Apr. Stereau S.A.S. Achère WWTP, Analysis of homogenization in 2 basin. Duration: 3 Weeks.

2017 Apr. INVENT-ET. Fritz Island WWTP. Analysis of operation in biological reactors. Duration: 1 month.

2017 Apr. Geppert GmbH; Analysis of mixing performance of novel hexagonal mixer prototype; Duration: 2 weeks.

2017 May. INVENT Pacific. Kawana WWTP. Analysis of mixing in a MBBR; Duration: 1 month.

2017 May. Stereau S.A.S. Achère WWTP, Analysis of homogenization tank. Duration: 3 Weeks.

2017 May. INVENT-ET. Humber WWTP. Analysis of mixing tank. Duration: 1 month.

2017 Jun. INVENT Pacific. Melbourne Water WTP. Analysis of mixing, homogenization and TSS profile in non-regular tanks. Duration: 1 month.

2017 Jul. EJS Environmental Engineering. Netanya WWTP. Analysis and optimization of secondary clarifier. Duration: 4 months.

2017 Aug. Commune of Limoges. Limoges WWTP (France); Analysis and optimization of oxidation ditch at different operating conditions. Evaluation of proposed design compared with existing design. Duration: 3 months.

2017 Sep. INVENT-ET. Nashville WWTP. Analysis of mixing tank. Duration: 1 month.

2017 Sep. INVENT Pacific; Melbourne Water WTP. Analysis of operation in anoxic zone. Duration: 1.5 months.

2017 Dec. Hof Hacarmel Water Treatment Co. LTD; Nir-Etzion WWTP; Analysis and optimization of secondary clarifier and splitter chambers. Duration: 4 months.

2018 Jan. PWT Wasser- und Abwassertechnik GmbH. Analysis of slow decarbonisation reactor. Duration: 2 months.

2018 May. Tecalmit Flow Oy. Jyväskylä WTP. Analysis of flocculation basin with different mixer types. Duration: 2 months.

2018 May. Tecnología Intercontinental SAPI (Mexico). San Fernando WWTP; Analysis and flow optimization in 4 basins. Duration: 3 months.

2018 Jun. Sources S.A. Design of large double-ring aeration system to ensure even air flow distribution at minimal head loss. Duration: 1 month.